Views in the last 30 days: 15
Estimated read time: 6 minute(s)
ACH Calculator — Ventilation Materials & Cost
Size airflow by target ACH or reverse from known flow. Estimate diffusers, ducting, fans, and cost for India / US / UK.
Unit Rates (Editable)
Region: India (₹)Sources & Rationale (tap to view)
- Rates are indicative materials (no labor) — edit to suit supplier quotes in your region.
Please verify with your supplier.
Methodology, Formulas & Unit Math
Core
- ACH = (Q × 60) / V, where Q is airflow (m³/h) and V is room volume (m³).
- Q = (ACH × V) / 60.
- Volume V = L × W × H.
- Round duct (suggested) diameter: D = √(4·q / (π·v)), where q is m³/s and v is design velocity (default 6 m/s supply branch).
- Fan power (shaft) ≈ (Qm³/s × ΔP) / η. Defaults: ΔP=250 Pa, η=0.55.
Standards dropdown populates notes and typical targets. When a standard is chosen, a note appears: “Values derived from <Standard> (user must verify).”
Air Changes per Hour (ACH) Calculator — What it is, how it works, and how to use it
A quick, practical way to size airflow, estimate materials & cost, and print a clean report.
What this calculator does
ACH tells you how many times a room’s air volume is replaced in one hour. This tool goes beyond the basic math:
- Enter one or many segments (rooms/zones) with dimensions.
- Choose a target ACH or use Reverse mode with a known flow.
- SI / Imperial toggle with live conversions.
- Standards dropdown (ASHRAE 62.1/62.2, CIBSE, NBC India) with safety notes.
- Suggests round duct diameter, counts diffusers/grilles, and estimates materials & cost for India / US / UK (rates editable).
- One-click HTML Report with KPIs, tables, and assumptions.
How it works (plain language)
- Room volume V = L × W × H.
- ACH ↔ Airflow:
- Given ACH → Q:
Q = ACH × V
(m³/h). - Given flow → ACH:
ACH = (Q × 60) / V
.
- Given ACH → Q:
- Duct suggestion (round): with design velocity v,
D = √(4·q / (π·v))
, whereq = Q/3600
(m³/s). - Devices: Diffusers & grilles =
ceil(Q / capacity)
. - Costing: GI sheet area ≈ πD × run; flex ≈ 20% of run; + diffusers, grilles, dampers, fan, and a wastage %.
Methodology & unit math
Switching SI/Imperial converts inputs and outputs on the fly (m↔ft, m³/h↔CFM, etc.).
ACH = (Q × 60) / V Q = (ACH × V) / 60 V = L × W × H q = Q / 3600 (convert m³/h → m³/s) D = sqrt( 4·q / (π·v) ) Fan power (shaft) ≈ (q_total × ΔP) / η [default ΔP=250 Pa, η=0.55]
Standards dropdown shows a note: “Values derived from <Standard> (user must verify).”
How to use the calculator
- Pick Units: SI or Imperial.
- Choose a Standard (optional): ASHRAE 62.1/62.2, CIBSE, NBC India.
- Set Region Pricing: India / US / UK, edit rates as needed.
- Add Segments: name rooms; use Presets for quick ACH values.
- Enter Geometry: Length, Width, Height.
- Choose Mode:
- Target ACH → compute Q, or
- Known flow → compute ACH (reverse check).
- Refine: design velocity, estimated run length (or leave 0 to auto-estimate), device capacities.
- Review Results per segment and the KPIs at the bottom.
- Export/Import JSON for sharing; use Generate HTML Report for printing.
Name segments clearly (e.g., “Office – East”) so the report reads like a professional submittal.
Worked example — complete project
Scenario Small office suite, SI units, India pricing, wastage 5%, target ACH = 6. Device capacity defaults: 540 m³/h per diffuser and per return grille. Design branch velocity: 6 m/s.
Segment A — “Office – East”
- Dimensions: L=8 m, W=5 m, H=3 m → V = 120 m³
- Target ACH = 6 → Q = 720 m³/h (q = 0.20 m³/s)
- Duct ⌀ with v=6 m/s:
D = √(4·0.20/(π·6)) ≈ 0.206 m
→ round to 200–225 mm - Devices: diffusers
ceil(720/540)=2
, return grilles = 2, dampers = 2 - Run length (auto): ~1.5×L = 12 m
- GI sheet area: π×D×run ≈ 7.77 m²; Flex ≈ 2.4 m
Item | Qty | Rate (₹) | Amount (₹) |
---|---|---|---|
GI duct sheet | 7.77 m² | 1100/m² | 8,543 |
Flexible duct | 2.4 m | 350/m | 840 |
Supply diffusers | 2 | 500 each | 1,000 |
Return grilles | 2 | 480 each | 960 |
Volume dampers | 2 | 700 each | 1,400 |
Fan unit | 1 | 6,500 each | 6,500 |
Subtotal | 19,243 | ||
+5% allowance | 20,155 |
Segment B — “Meeting Room”
- Dimensions: L=6 m, W=4 m, H=3 m → V = 72 m³
- Target ACH = 6 → Q = 432 m³/h (q = 0.12 m³/s)
- Duct ⌀ with v=6 m/s:
D = √(4·0.12/(π·6)) ≈ 0.160 m
→ round to 160–180 mm - Devices: diffusers = 1, return grilles = 1, dampers = 1
- Run length (auto): ~1.5×L = 9 m
- GI sheet area: π×D×run ≈ 4.52 m²; Flex ≈ 1.8 m
Item | Qty | Rate (₹) | Amount (₹) |
---|---|---|---|
GI duct sheet | 4.52 m² | 1100/m² | 4,976 |
Flexible duct | 1.8 m | 350/m | 630 |
Supply diffuser | 1 | 500 each | 500 |
Return grille | 1 | 480 each | 480 |
Volume damper | 1 | 700 each | 700 |
Subtotal | 7,286 | ||
+5% allowance | 7,651 |
Numbers are planning estimates. Adjust device capacities, run length, and unit rates for your project.
Load the sample into your calculator
- Click Download Sample JSON above.
- Open the calculator and press Import JSON.
- Select the downloaded
ach_sample_project.json
file. - Review/modify anything (rates, capacities, runs), then generate your report.
The sample includes two segments (Office – East, Meeting Room), SI units, India pricing, and 5% allowance.